The conditions, written into the rollout plan before a release stage starts, under which the pipeline returns to the previous version automatically: a floor breached against the control group, a disagreement or override rate above a threshold, a severity-1 event. A criterion set after the metric moved is a negotiation, not a control.
- Developed in
- ch. 15, Progressive delivery as a control
ch. 05, Pattern: Staged Rollout with Rollback Criteria - Chapters
- ch. 05, Patterns · ch. 15, Deployment
- Contrast with
- Kill switch
- Source
- Defined by this Body of Knowledge: the section it is developed in is the source
Where it is used
2 chapters of the Body of Knowledge use the term. Each link opens the first section that does.
- 05 · Patterns Pattern: Staged Rollout with Rollback Criteria 2 mentions
- 15 · Deployment The deployment lifecycle at a glance 4 mentions
Patterns that use this term
3 pattern pages use the term, most mentions first.
- Staged Rollout with Rollback Criteria 4 mentions
- Drift & Fairness Monitor 1 mention
- Deactivation, Localisation & Retirement Runbook 1 mention
Related terms
Sources
No external source: the term is coined or used in a specific sense by this Body of Knowledge, and the section linked under "Developed in" is its source.
Definitions of legal terms paraphrase the cited text, which governs. Dated statements are as of .