---
title: "Rollback criteria"
description: "The conditions, written into the rollout plan before a release stage starts, under which the pipeline returns to the previous version automatically: a floor breached against the control group, a…"
canonical: https://aigovernanceengineer.com/glossary/rollback-criteria
author: "Jorge García Aibar"
license: "CC BY 4.0 (https://creativecommons.org/licenses/by/4.0/)"
doi: https://doi.org/10.5281/zenodo.22956197
version: "0.5.0"
updated: 2026-09-25
---

# Rollback criteria

The conditions, written into the rollout plan before a release stage starts, under which the pipeline returns to the previous version automatically: a floor breached against the control group, a disagreement or override rate above a threshold, a severity-1 event. A criterion set after the metric moved is a negotiation, not a control.

- Developed in: [ch. 15, Progressive delivery as a control](https://aigovernanceengineer.com/bok/governing-deployment#progressive-delivery-as-a-control); [ch. 05, Pattern: Staged Rollout with Rollback Criteria](https://aigovernanceengineer.com/patterns/staged-rollout-rollback-criteria)
- Chapters: [ch. 05, Patterns](https://aigovernanceengineer.com/bok/patterns) · [ch. 15, Deployment](https://aigovernanceengineer.com/bok/governing-deployment)
- Contrast with: [Kill switch](https://aigovernanceengineer.com/glossary/kill-switch)
- In the glossary chapter: https://aigovernanceengineer.com/bok/glossary#t-rollback-criteria

## Sources

Defined by this Body of Knowledge: the section it is developed in is the source.
