Explore this system
Step through curated paths without changing the source diagram.
Beat
Next
ReadyChapter 01 / 01
Guided chapter
Diagram guideExplore this system
Inspecting compiled semantics
E ExportT ThemeS Style0 Reset+ Zoom in- Zoom outEsc Close
Find a node
⌕/
No matching nodes
Semantic passport
Verified source
Authored reach
Route probeChoose a start node
Pick two semantic nodes on the diagram
Choose the source, then the destination. Direction matters.
Semantic lensCompare system roles
Choose up to two semantic kinds. One reveals its real traffic; two compare only direct authored relationships.
Choose a kind to inspect its nodes and touching relationships.
Semantic radar
Building overview
Click nodeDrag to pan
Semantic radar needs more MAP space.
Two moves in one summer
• The Digital Omnibus entered into force on 27 July 2026 and reset the high-risk clock
• GPAI enforcement went live on 2 August 2026, with fines up to 3% of turnover or EUR 15 million
• The law began asking for engineered evidence
The next flips, dated in the Omnibus
• 2 December 2026: new Article 5 bans on AI-generated intimate imagery without consent and child sexual abuse material, and Article 50(2) marking for generative systems placed on the market before 2 August 2026
• Annex III high-risk obligations moved to 2 December 2027, Annex I embedded high-risk to 2 August 2028
• High-risk systems for public authorities already on the market must comply by 2 August 2030
Runway, not relief
• The extra time is more runway to do the engineering, not less of it
• Pick the next stage and map its obligations to artefacts in chapter 08
• Build the stack before the dates, not after them